Boryeong, Chungnam Water Electrolysis-Based Hydrogen Production Base Construction Project
(H2KOREA, 2023)
- Project duration
- 36 months (Oct 2023 - Sep 2026)
- Project cost
- KRW 11.59 billion
- Project details
-
Water electrolysis equipment with capacity of 2.5MW
and hydrogen production of 1 ton/day
- Project sites
-
Songhak-ri, Boryeong-si, Chungcheongnam-do
Led by overseeing institutions (Korea Midland Power),
Local government (Boryeong, Chungcheongnam-do),
Participants (Techcross Water & Energy,
Hyundai Engineering & Construction, ISTE)